Executive Director's Report —

 

  • The Levee Paving Project is almost complete. This project will pave the tops of the levee in an area between Oxbow Part and the Railroad Tracks in Hammond and from Cline Avenue to Kennedy Avenue in Highland.
  • With water levels low, a concerted effort is being made to clear fallen trees in Hart Ditch. The work is starting at Main Street and progressing north. 
  • The Georgia Street Project, located at approximately 33rd Avenue and Georgia Street has been substantially completed.  This project, located at approximately 33rd Avenue and Georgia Street, will raise and repave Georgia Street.
  • The 35th & Chase Project is being designed. This project will eliminate the current post and panel closure system. 
  • The Belmont Street Repair Project is currently under review by the USACE.
  • The Burr Street North Back-up Generator project is currently under attorney review.
  • The Hobart Marsh Mitigation and Hammond Tie-Back projects are moving along and look to be on track.
  • Approval for the Gary South Levee Project is in progress. This project will pave the levee from Chase to Martin Luther King Drive.
  • A meeting with the USACE is scheduled for July 19th to finalize the inspection reports.

 

       
NEXT MEETING
Wed OCT 12th 6pm
Munster Town Hall
map

2015 Inspection Reports

PDF and Powerpoint Downloads

Download

Meeting Audio

Sept Meeting

Download

Funding Application

Application for Project Funding

Download

       

 


Documents

Documents, Reports etc.

Media

Photos and Videos, Audio

River Gages

Little Calumet River Basin levels